Tuesday 9 September 2014

Ruddington Cardigan Update

I have about a third of the back done. It is pretty stretchy so there is a possibility that I'll frog the fronts and re-knit them a size smaller - we'll see.
The Cascade 220 doesn't have as tight a twist as some yarns but the stitch definition is evident.
At this rate, I'll have the back done in a couple of days. Then on to the sleeves which are stocking stitch except for cable detail above the wrist.


No comments:

Post a Comment